Blog

Hoy cargamos una S46 para nuestros clientes de Bolivia:
13 de abril de 2018

In Redcrane® we prepare each tower crane paying attention to every possible detail. We anticipating the loads of cranes for shipment, join parts of the crane with straps forming packages are then loaded directly into containers. Then we cover with bubble paper the most sensitive parts to prevent friction and shock. And finally our brand adhesives look well in specific places.

Once loaded the parts of the tower crane in each container, these are internally fixed to prevent movement during transport. All strips are checked and we make photos for client review.

Through this process, we get that each tower crane arrives in the best possible conditions to their destination, only to be discharged, assembly and operating in the shortest possible time.

Additionally, if the customer requests, we can provide our reconditioning service, painting, spare parts change, renewal of the entire electrical panel and new cable.

Below you can see a few photos on our preparation process. 

Compartir

Tags:

Logotipo    REDCRANE    Grúas automontantes    Grúas torre    Venta    Instalaciones    SAEZ    Cargas    Equipo    Imagen corporativa   

Comentarios

Envíanos tus comentarios